 Scope of services  During project start-up execution Voir les produits de la gamme
 
ABA oil & Gas Services will Execute & Manage & Supervise the following Start-up Activities :
  • Approve all Commissioning RFSU dossiers & installation from project
  • Acknowledge and sign handover certificate from Project commissioning
  • Approve and witness the OTP’s prepared by the Commissioning team, system by system
  • Receive new installations, check that new installations are in line with statement of requirement and meet requirements of operations division in terms of safety and operability
  • Smooth hand-over from the project team to the operations team
  • Approve and Acceptance of new facilities from Project
  • Contribute in planning and coordination for smooth integration of various activities phase
  • Day to day management of interfaces between Project and production on operational and safety issues
  • Interface / Focal point between Operations and Construction to ensure a smooth transition at the critical time frame of construction completion and initiation of operations
  • Focus point and main interface between construction, commissioning and operations
  • Liaise Liaise with commissioning and equipment vendors on providing adequate training
  • Identify with concerned site staff the training for operation/maintenance site personnel
  • Direct and Manage the Start-up of the new facilities
  • Coordinate / Manage interfaces with existing live” facilities
  • Safe start-up of the new installation. and trouble shooting
  • Sea-lines / Pipelines Dewatering & Pigging operation
  • Monitor Start-up activities performed / conducted in SIMOPS
  • Manage the Spading & De-spading plan for Safe Star-up (Oil-in, Gas-in, Hydrocarbon –in)
  • Manage Vendors support requirements during initial operations
  • Manage the start-up of new facilities
  • Test run / Performance test & guarantee
  • Responsible person to issue Test-runs results and testing / performance reports within the framework of the relevant Engineering processes
  • Good follow-up of the operation after start-up i.e. troubleshooting and clearance of the project punch list
  • Perform debugging and trouble shooting until new installations is fully operational and reliable
  • Prepare of the acceptance requirements of facilities hand over both for interim and final Operations
  • Bring the new Facilities systems – sub-system up to PAC (Provisional Acceptance Certificate)
  • Employing a detailed start-up schedule to effectively monitor all start-up activities
 
   
Phone/Fax : +216 74 619 080
E-mail : info@aba-ogs.com
 
Accueil | Introduction | Project phases of intervention | Definition of acceptance | Scope of services
Employment | References Projects / Companies | news | Newsletter | Contact
Copyright © 2010 Abaoilgasservices.com.tn. All rights reserved. POWERED BY CRESUS.